NextGen Building Project

Our mission is to know Christ and to make Him known! We want to continue to reach many people for Christ in our area and in the world.

God has spoken great and encouraging things over CityHill Church. These are two of the prophetic words we have received:

“I’m calling you to My presence. All you have need of will be available to you in My presence. My presence will grow stronger and stronger in this place, and there will be unusual manifestations of My presence in this place and people will say, “Have you heard what God is doing at CityHill Church?” 

“People will be drawn here and not know why they have come onto your property, but the presence of God will melt their hearts and they will be open to respond to Me here.”

Mike Hanchett (visiting speaker from USA, March 2012)

“The word I kept getting for you was double up, prepare to double up, prepare to double up.” 

Chanelle Rossouw July 2024

NextGen Building Project

Kids Facility

Double Volume Kids Facility

\

Undercover Meeting Area

Full Length of Facility

\

Widened Staircase

Widened Staircase from Field (removal of the water fountain)

\

CITYHILL KIDS EXTENSION

WHY? 

Current growth is creating space pressure. And we want to create space for future growth.

 

WHAT?

  • 2 floors of 600m2 each (same as 2 x Everskye size)
  • Playground areas on ground and first floor that can be used year-round
  • Classrooms for Little Stars (2-3 yrs) (instead of their current wooden cabins)
  • 200 seater hall for Golden Warriors
  • Multipurpose space for SHIFT (Grade 7-9) and Amped, and an overflow area for Grade 6’s.

ROOFED SEATING AREA

WHY? 

We value the idea that Life is Best Done Together. And we love it when people connect before and after meetings at our venue. We currently have table seating in our foyers for only 250 people. We plan to have seating for 1000 people once the project is complete.

 

WHAT?

550m2 of a roofed ‘verandah’ off the front of the building

SOME FAQs

When are we hoping to start building?

As soon as sufficient funds become available through donations. We are hoping that we can raise the money over 18 months (Jan 2026 – June 2027) and get the contractor on site in July 2026.

How long will the construction of the new building take?

Approximately 8 months

Are there Section 18A tax certificates available for donations given?

No, because this project does not fall within the s18A allowances.

Building Costs

Total build cost is approximately  R15 million. We are looking to raise this money primarily through offerings.

CityHill Kids Extension Exterior

The proposed facility comprises two floors of 600m² each—equivalent to double the size of Everskye.

It will feature jungle gym areas on both the ground and second floors, designed for year-round use. Dedicated classrooms will be included for the Little Stars (ages 2–3), replacing their current wooden cabins. 

An extended hall will be built to accommodate the Golden Warriors, and a versatile multipurpose space will serve both SHIFT (Grades 7–9) and Amped. There will also be an overflow area on the FunkyTown level for the Grade 6 kids.

CityHill Kids Extension Interior

The new facility will consist of two floors, each measuring 600m² — equivalent in size to two Everskye buildings. This provides ample space for dedicated learning areas, play zones, and multipurpose use, ensuring the building meets the diverse needs of all age groups.

0
    0
    Your Cart
    Your cart is emptyReturn to Giving